CVE records

Every CVE as the CVE Program publishes it, refreshed every ten minutes, with NVD's analysis, CISA's known-exploited status and a healthcare tag. Free accounts get a daily email of the CVEs that match up to 3 of their products on My program; subscribers get each one the moment it is published. Where the data comes from: sources.

Updated under an hour ago ()

What this means for you

This week: 3,335 CVEs published, 225 critical, and 2 newly confirmed exploited. Add your stack to see whether any of them hit you.

Published in the last 7 days
3,335
Show in the list
Critical, last 7 days
225
Show in the list
Healthcare-tagged, last 7 days
3
Show in the list
Known exploited (CISA KEV)
1,764
Show in the list

Showing CVEs that name the product oracle:primavera_p6_enterprise_project_portfolio_management. Show all products

Free: a daily email for up to 3 products and the weekly digest. No card, no password. By continuing you agree to the Terms and Privacy Policy.

16 CVEs
Showing 1 to 10.
CVESeverityTitlePublished
CVE-2026-91399Medium 4.3Vulnerability in the Primavera P6 Enterprise Project Portfolio Management product of Oracle Construction and Engineering (component: Web Access).
Assigned by oracle
Oct 20, 2026
CVE-2026-91376Medium 6.5Vulnerability in the Primavera P6 Enterprise Project Portfolio Management product of Oracle Construction and Engineering (component: Web Access).
Assigned by oracle
Oct 20, 2026
CVE-2021-45105
Healthcare
Medium 5.9Apache Log4j2 does not always protect from infinite recursion in lookup evaluation
Assigned by apache
Dec 18, 2021
CVE-2021-2351
Healthcare
High 8.3Vulnerability in the Advanced Networking Option component of Oracle Database Server.
Assigned by oracle
Jul 20, 2021
CVE-2020-5421
Healthcare
High 8.7RFD Protection Bypass via jsessionid
Assigned by pivotal
Sep 18, 2020
CVE-2019-10219
Healthcare
Medium 6.5A vulnerability was found in Hibernate-Validator.
Assigned by redhat
Nov 8, 2019
CVE-2019-17091
Healthcare
Medium 6.1faces/context/PartialViewContextImpl.java in Eclipse Mojarra, as used in Mojarra for Eclipse EE4J before 2.3.10 and Mojarra JavaServer Faces before 2.2.20, allows Reflected XSS because a client windo…
Assigned by mitre
Oct 2, 2019
CVE-2018-19360Critical 9.8FasterXML jackson-databind 2.x before 2.9.8 might allow attackers to have unspecified impact by leveraging failure to block the axis2-transport-jms class from polymorphic deserialization.
Assigned by mitre
Jan 2, 2019
CVE-2018-19362Critical 9.8FasterXML jackson-databind 2.x before 2.9.8 might allow attackers to have unspecified impact by leveraging failure to block the jboss-common-core class from polymorphic deserialization.
Assigned by mitre
Jan 2, 2019
CVE-2018-19361Critical 9.8FasterXML jackson-databind 2.x before 2.9.8 might allow attackers to have unspecified impact by leveraging failure to block the openjpa class from polymorphic deserialization.
Assigned by mitre
Jan 2, 2019

CVSS is the assigning CNA's score where it gives one, otherwise NVD's. The healthcare tag is a documented heuristic (a list of clinical and health IT vendors, and clinical terms in the description), not a classification. The CVE record is authoritative.

Essential cookies only, unless you allow a Google ads cookie. See our .